Renewable Energy

Considering the high potential of Albania in water reserves and in hydro power production we are currently focused in the field of renewable energy production mostly hydro energy. We have engaged a professional team to meet the objectives of the company, aiming to be in one of the most important producers of pure energy.

Through international experience, “Erpa Invest” is committed to invest with European standards in the production of clean energy. Further, “Erpa Invest” is committed to achieve a balance between the economy, environment and social development in all its activities.

Currently "Erpa Invest" owns 4 hydropower projects that are:​

  1. Hec Shtika 1.3 MW 
  2. Hec Lashkiza 5 MW
  3. Hec Kabash Porocan 5 MW   
  4. Hec Vernik 10.5 MW

 

  • Location: Kelcyre, Permet
  • Installed capacity: 1.3 MW
  • Kw produced annually approximately: 3,900,000 kw

Hec Shtika is a well-designed hydro power plant ( HPP) in southern Albania. The project is built on the river Shtika in the district of Kelcyra,Permet.

Hec Shtika is in operation since the beginning of 2016 exceeding the predicted production values. All materials used are branded CE and works are conducted by respecting European standards EN. The machines are all European (turbine - Mecamidi (French), Generator - Marelli (Italy), Transformers - Art Tra (italian), Celan - ABB and Schneider).

Photo before construction
Photo during construction
Photo after completion of construction
  • Location: Lashkiza, Peshkopi
  • Installed capacity: 5 MW
  • Kw produced annually approximately: 17,500,000 kw

"Hec Lashkiza" is a well-studied project which is located in the district of Peshkopi, the administrative center Zall-Dardhe. The cascade consists of two hydropower plants. “Lashkiza 1” with an installed capacity of 4.1 MW uses the waters of the big stream “Lashkiza” and two smaller streams near to the big one, the stream of Vllathit and the stream of Shehu. “Lashkiza 2” with an installed power of 0.9 MW exploits the water of “Lashkiza” stream and the waters of the stream “Kifrres”.

Photos before construction
Photo during construction
  • Location: Porocan, Gramsh
  • Installed capacity:  5 MW
  • Kw produced annually approximately: 17,500,000 kw

"Hec Kabash Porocan" is a well-studied project which is located in Poroçan village, Municipality of Gramsh, Elbasan. The cascade consists of two hydropower plants. "Hec Poroçan" with an installed capacity of 4 MW exploits the waters of the Stream Holta one of the main branches of Devoll river. "Hec Kabash" with an installed capacity of 1 MW which exploits waters of the stream Holta , stream of Pursit and Zavalines.

Photo before construction
Photo during construction
  • Location: Vernik, Vlore
  • Installed capacity:  10.5 MW
  • Kw produced annually approximately: 36,750,000 kw

"Hec Vernik" is a well-studied project which is located in the Village of Vernik, the administrative unit of Brataj, Municipality of Selenice,Vlore. The cascade consists of three hydropower plants. “Vernik 1” with an installed capacity of 1 MW exploits the waters of the stream “Perze” located in the upper river of Smokthina. “Vernik 2” with an installed power of 2 MW exploits the waters of the river “Smokthina” and its branches. “Vernik 3” with an installed power of 7.5 MW uses the waters of the River Smokthina.

Photos of project